Infrastructure

Water Supply Networks

 Swakopmund-Langer Heinrich scheme

 

Date of commissioning

September 2006

Capital cost at date of construction

N$ 91 million

Purpose of use

Potable water supply to Langer Heinrich Mine

Brief description of system

Water is transferred from the Swakopmund Terminal reservoir to the Langer Heinrich Terminal Reservoirs by means of a 300 mm diameter, 82 km long DCI pipeline and three pump stations.

Capacity

205 m3/h

   
 

 