Swakopmund-Rössing scheme
Date of commissioning
1976
Capital cost at date of construction
na
Purpose of use
Potable water supply to Arandis & Rössing Mine
Brief description of system
Potable water is transferred from the Swakopmund Terminal reservoir to the Rössing Terminal Reservoir by means of a 700 mm diameter, 55 km long steel pipeline and four pump stations.
Capacity
1 100 m3/h
Swakopmund-Langer Heinrich| Back to Water Supply Networks Main Page Swakoppoort-Von Bach