Swakoppoort-Von Bach scheme
Date of commissioning
Initial scheme: 1979
Upgraded scheme - March 2004
Capital cost at date of construction
na
Purpose of use
Transfer of raw water from Swakoppoort to Von Bach Dam with reverse gravity flow option from Von Bach Dam to Swakoppoort Dam.
Brief description of system
Raw water is pumped from the Swakoppoort Dam to the Von Bach Dam by means of a 600 mm diameter, 54 km long steel pipeline and three pump stations.
Capacity
1450 m3/h